INTRODUCTION Heatizon Systems Installation DVD Introduction  
THE ROUGH IN
   
  1. The Back Plate  
  2. Back Plate Location and Rough In Box  
  3. Mounting the Back Plate  
  4. Determining Connection Points  
  5. Running the Cold Leads  
  6. Jumpers Between Areas  
  7. Location of the Activation Device  
  8. Running the Primary Power  
     
CONNECTIONS
   
  Cold Lead to Cold Lead  
 
  1. Crimping the Connection
  2. Soldering and Heatshrink
 
  Cold Lead to Tuff Cable  
 
  1. Crimping the Connection
  2. Soldering and Heatshrink
 
  Tuff Cable to Tuff Cable Splice  
 
  1. Tuff Cable Splice
 
  Cold Lead to ZMesh  
 
  1. Cold Lead to Transition Plate
  2. ZMesh to Transition Plate
 
  ZMesh to ZMesh Splice  
 
  1. Positioning the Splice Plate
  2. Soldering the Spice Plate
 
TRANSFORMER & CONTROL UNIT    
 
  1. Introduction and Mounting the Transformer
  2. Sheet Metal and Control Box Mounting
  3. Cold Lead Connections and the Torroid
  4. S202 & S203 Double Sided Transformers
  5. Transformer Power Wire Connections
  6. Primary Power Connections to the Control Box
  7. The Thermostat Wire
  8. The Thermistor
  9. Adjusting Control Board Jumpers
  10. Inserting the Control Board into The Control Unit
  11. Preliminary Amperage Testing
  12. Adjusting the Potentiometer on the Control Board
  13. Final Adjusting and Warmup Period
  14. Recording System Information & Testing
  15. Activating with the Activation Device
 
APPLICATIONS    
     
Floor and Space Heating
  ZMesh Floor Heating Standard  
 
  1. Introduction
  2. Layout and Design
  3. Starting Connections and Installation
  4.Securing ZMesh to a Concrete Subfloor
  5.Securing ZMesh to a Wood Subfloor
  6. Final Folding and Securing
  7. Final Connection
  8. After Installation Element Test
 
  ZMesh Floor Heating Retrofit  
 
  1. Introduction
  2. Layout and Spacing
  3. Folding and Securing
  4. Measuring and Joist Kits
  5. Connections
  6. Securing with Staples
  7. Creasing the Folds
  8. After Installation Element Test
 
  Tuff Cable Floor Heating Interior  
 
  1. Introduction
  2. Connections
  3. Measuring and Layout
  4. Anchoring Kits for Concrete Subfloor
  5. Securing to a Wood Subfloor
  6. Verifying Length
  7. After Installation Element Test
 
Roof Deicing    
  Tuff Cable in a Heatsink Kit for Roof Deicing  
 
  1. Introduction of the Heatsink Installation
  2. Heatsink Kits: Components and Install
  3. Marking the Location of the Runs
  4. Installing the Heatsink Kit Boards
  5. Making the First Connections
  6. Layout of the Heating Element
  7. Final Connections
  8. Mortering the Grooves
  9. After Installation Element Test
  10. Covering with Ice and Water Shield
 
  ZMesh Roof Deicing  
 
  1. Introduction of ZMesh Material
  2. Layout and Design
  3. Installation Preparation / Drip Edge
  4. Starting Connections
  5. Installing the ZMesh
  6. Final Securing of ZMesh
  7. Final Connections
  8. After Installation Element Test
  9. Installing Ice and Water Shield
 
Snow & Ice Melting    
  Tuff Cable in a Sand Bed Under Pavers  
 
  1. Introduction and Layout
  2. Preparing for Layout
  3. Beginning Layout and Measuring
  4. Surface Preparation
  5. The Paver Kit with Spikes
  6. Starting Connection and Element Install
  7. Final Connection
  8. After Installation Element Test
  9. Final Covering of Tuff Cable with Sand
 
  Tuff Cable in New Pour Concrete  
 
  1. Introduction to Installation
  2. Layout Preparation
  3. Making the Layout
  4. Surface Preparation
  5. Installing Castle Chairs
  6. Marking the Concrete Joint Jumpers
  7. Starting Connections & Installing Element
  8. Final Measuring & Securing Element
  9. Installing Jumpers
  10. After Installation Element Test
 
  Tuff Cable Retrofit  
 
  1. Introduction
  2. The Layout
  3. Verifying th Length of Heating Element
  4. Saw Cutting and Power Washing
  5. Starting Connection and Element Installation
  6. Final Connection and Testing
  7. Installing the Backer Rod and Sealing the Cuts