{"id":310,"date":"2022-02-17T17:06:58","date_gmt":"2022-02-17T17:06:58","guid":{"rendered":"https:\/\/www.heatizon.com\/heatwave\/?p=310"},"modified":"2022-02-18T18:10:37","modified_gmt":"2022-02-18T18:10:37","slug":"heatwave-cable-installation","status":"publish","type":"post","link":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/","title":{"rendered":"Heatwave Cable Installation"},"content":{"rendered":"\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-luminous-vivid-amber-color has-text-color\" href=\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/16\/installation-basics\/\" style=\"border-radius:5px\">Previous Step<\/a><\/div>\n\n\n\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-luminous-vivid-amber-color has-text-color\" href=\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/16\/heatwave-mat-installation\/\" style=\"border-radius:5px\">Mat Installation<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"5-3-heatwave-cable-installation\">5.3 Heatwave\u00ae Cable Installation<\/h3>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"alignleft size-large is-resized\"><img  title=\"\" loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01-1024x768.jpg\"  alt=\"heatwave-cable01-1024x768 Heatwave Cable Installation\"  class=\"wp-image-313\" width=\"251\" height=\"188\" srcset=\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01-1024x768.jpg 1024w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01-300x225.jpg 300w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01-768x576.jpg 768w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01.jpg 1500w\" sizes=\"auto, (max-width: 251px) 100vw, 251px\" \/><\/figure><\/div>\n\n\n\n<p>Verify the correct Heatwave\u00ae Cable has been purchased to heat the area selected and that the correct spacing has been determined for the area being heated, the Watts to be delivered, and the size of system purchased. DO NOT CUT THE RED HEATING CABLE to fit an area. See the Tables in Section 4.2.<\/p>\n\n\n\n<p><strong>5.3.1<\/strong> Plan room layout using tape measure, marking pencil, and chalk line. Lay out perimeter of area to be heated first, keeping a minimum of 1.5 inches from walls and or cabinets and the first run of element. Once the layout is complete, roll out the Heatwave\u00ae Heating Cable, making sure that both ends of the heating element (where the Heatwave\u00ae Heating Cable is pre-connected to the Cold Lead segment) are within 15 vertical and horizontal feet of the power switching thermostat location to accommodate Cold Lead length.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"alignright size-large is-resized\"><img  title=\"\" loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable02-1024x768.jpg\"  alt=\"heatwave-cable02-1024x768 Heatwave Cable Installation\"  class=\"wp-image-312\" width=\"259\" height=\"194\" srcset=\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable02-1024x768.jpg 1024w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable02-300x225.jpg 300w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable02-768x576.jpg 768w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable02.jpg 1500w\" sizes=\"auto, (max-width: 259px) 100vw, 259px\" \/><\/figure><\/div>\n\n\n\n<p><strong>5.3.2<\/strong> Start by placing the mat such that the connection point and the temperature sensor are in their intended final positions and bring the cold lead to the thermostat or connection box. If a floor alarm or \u201cscreamer box\u201d is being used, attach it now (see section 7.4, FLOOR ALARM USAGE). Ensure the connection between the heating cable and cold lead will be properly embedded in thinset and\/or mortar.<br>Continue by laying out Heatwave\u00ae Heating Cable on the predetermined layout, and fasten with strapping or plastic clips as described below for the floor surface.<\/p>\n\n\n\n<p><strong>5.3.3<\/strong> When anchoring the Heatwave\u00ae Heating Cable to wood subfloors use either the Plastic Clips (Heatizon Part PLASCLIPKIT) or Heatwave\u00ae Cable Strap (Heatizon Part HWCSTRAP33).<\/p>\n\n\n\n<div class=\"wp-block-columns has-background is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\" style=\"background-color:#700000\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:20%\">\n<figure class=\"wp-block-image size-large\"><img  title=\"\" loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/DSCF0097-1024x768.jpg\"  alt=\"DSCF0097-1024x768 Heatwave Cable Installation\"  class=\"wp-image-311\" srcset=\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/DSCF0097-1024x768.jpg 1024w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/DSCF0097-300x225.jpg 300w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/DSCF0097-768x576.jpg 768w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/DSCF0097-1536x1152.jpg 1536w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/DSCF0097-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:80%\">\n<p class=\"has-white-background-color has-background\" style=\"font-size:12px\">Plastic Clips: Each 90 degree bend and each 180 degree turn requires two Heatizon Plastic Clips. Heatizon Plastic Clips should be spaced approximately every 24 inches along the length of the Heating cable. Heatizon Plastic Clips can be inserted around Heatwave\u00ae Heating Cable, and secured to sub floor by hammering nail or driving a screw through anchor ends until both plastic tails are flat against sub floor surface. Repeat with each Heatizon Plastic Clip until all clips are secure.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns has-background is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\" style=\"background-color:#700000\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:80%\">\n<p class=\"has-white-background-color has-background\" style=\"font-size:12px\">Cable Strap: Heatwave\u00ae Cable Strap is used to hold Heatwave\u00ae Cables in place on the sub floor surface at the spacing required. Variable spacing options can be maintained using this thin metal strapping. Cut the strap to length using ordinary snips. Anchor the strap with screws on plywood or backer board or with adhesive, hot glue or 2-sided tape on concrete. The strap should be installed on opposite ends of the room and every five feet in between. If additional securing of the cable is required, hot glue or tape can be used to hold in place during the thin set or self-leveling pour. Check continuity between the Heatwave\u00ae Heating Cable and the strap as the cable is installed.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:20%\">\n<figure class=\"wp-block-image size-full\"><img  title=\"\" loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"633\" src=\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-strapping.jpg\"  alt=\"heatwave-strapping Heatwave Cable Installation\"  class=\"wp-image-314\" srcset=\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-strapping.jpg 1000w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-strapping-300x190.jpg 300w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-strapping-768x486.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p><strong>5.3.4<\/strong> If Heatwave\u00ae Heating Cable is being installed directly on existing concrete, a Heatwave\u00ae Anchoring Plug Kit (HWANCHPLUGKIT) may be purchased. Use a 1\/4\u201d cement drill bit to drill holes 1\u00bc\u201d deep in every location where a nail or screw will be located. Install one Anchoring Plug into each pre-drilled hole by tapping plugs until they are flush with the surface of the concrete. Anchoring Plugs should fit tightly in pre-drilled holes. If using Heatizon Plastic Clips, put a clip around Heatwave\u00ae Heating Cable and secure by hammering nail through anchor ends directly into the wood plug, until both plastic tails of the clip are flat against the concrete and plug. Repeat with each Heatizon Plastic Clip until all clips<br>are secure.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"alignright size-full is-resized\"><img  title=\"\" loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/cable-install.jpg\"  alt=\"cable-install Heatwave Cable Installation\"  class=\"wp-image-203\" width=\"186\" height=\"186\" srcset=\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/cable-install.jpg 300w, https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/cable-install-150x150.jpg 150w\" sizes=\"auto, (max-width: 186px) 100vw, 186px\" \/><\/figure><\/div>\n\n\n\n<p><strong>5.3.5<\/strong> Continue laying out and anchoring Heatwave\u00ae Heating Cable until complete. Make certain the end of the Cold Leads attached to the Heatwave\u00ae Heating Cable return to the thermostat location. When all of the Heatwave\u00ae Heating Cable has been installed and secured, run the second Cold Lead (if there are two) parallel to the first Cold Lead back to the thermostat, and secure both Cold Leads to the stud nearest the chosen location for the thermostat. Ensure the connection between the heating cable and cold lead will be properly embedded in thinset and\/or mortar. This can be accomplished by routing out a small amount of the floor (create a small channel) to lower the profile of the connection.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"5-3-6-measure-the-resistance-test-2\">5.3.6 MEASURE THE RESISTANCE (TEST #2)<\/h3>\n\n\n\n<p>Use a digital Ohm meter to measure the resistance of the Heatwave\u00ae Mat\/Cable and compare<br>it to the total Ohms in the tables in Section 4.1 for Mats or in Section 4.2 for Cables. Record<br>the measured resistance on the Registration Form. Documenting the resistance at each stage<br>of installation is required for warranty purposes. Also, measure the resistance between each<br>conductor and the shielding\/ground wire. Both should read infinity. Please refer to Section 7<br>(Commissioning) for instructions on how to measure the resistance.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-right is-layout-flex wp-container-core-buttons-is-layout-765c4724 wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-black-color has-luminous-vivid-amber-background-color has-text-color has-background\" href=\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/completing-installation\/\" style=\"border-radius:5px\">Next Step<\/a><\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"jump-to-section\">Jump to Section<\/h2>\n\n\n<ul class=\"wp-block-categories-list wp-block-categories\">\t<li class=\"cat-item cat-item-26\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/general-guidelines\/\">1. General Guidelines<\/a>\n<\/li>\n\t<li class=\"cat-item cat-item-27\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/heatwave-system\/\">2. Heatwave System<\/a>\n<\/li>\n\t<li class=\"cat-item cat-item-28\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/3-floor-heating-design\/\">3. Floor Heating Design<\/a>\n<\/li>\n\t<li class=\"cat-item cat-item-29\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/4-product-selection\/\">4. Product Selection<\/a>\n<\/li>\n\t<li class=\"cat-item cat-item-30\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/5-installation\/\">5. Installation<\/a>\n<\/li>\n\t<li class=\"cat-item cat-item-31\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/6-completing-installation\/\">6. Completing Installation<\/a>\n<\/li>\n\t<li class=\"cat-item cat-item-32\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/7-commissioning\/\">7. Commissioning<\/a>\n<\/li>\n\t<li class=\"cat-item cat-item-33\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/8-heatwave-expansion\/\">8. Heatwave Expansion<\/a>\n<\/li>\n\t<li class=\"cat-item cat-item-34\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/9-thermostat-quick-start\/\">9. Thermostat Quick Start<\/a>\n<\/li>\n\t<li class=\"cat-item cat-item-37\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/final-steps\/\">Final Steps<\/a>\n<\/li>\n\t<li class=\"cat-item cat-item-24\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/\">Installation<\/a>\n<\/li>\n\t<li class=\"cat-item cat-item-25\"><a href=\"https:\/\/www.heatizon.com\/heatwave\/category\/installation\/introduction-warnings\/\">Introduction &amp; Warnings<\/a>\n<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>5.3 Heatwave\u00ae Cable Installation Verify the correct Heatwave\u00ae Cable has been purchased to heat the area selected and that the correct spacing has been determined for the area being heated, the Watts to be delivered, and the size of system purchased. DO NOT CUT THE RED HEATING CABLE to fit an area. See the Tables [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[],"class_list":["post-310","post","type-post","status-publish","format-standard","hentry","category-5-installation"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Heatwave Cable Installation -<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Heatwave Cable Installation -\" \/>\n<meta property=\"og:description\" content=\"5.3 Heatwave\u00ae Cable Installation Verify the correct Heatwave\u00ae Cable has been purchased to heat the area selected and that the correct spacing has been determined for the area being heated, the Watts to be delivered, and the size of system purchased. DO NOT CUT THE RED HEATING CABLE to fit an area. See the Tables [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-02-17T17:06:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-02-18T18:10:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1125\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"jallen\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"jallen\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/\"},\"author\":{\"name\":\"jallen\",\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/#\/schema\/person\/f57745a7ae17275e097d2c898e8ec0b3\"},\"headline\":\"Heatwave Cable Installation\",\"datePublished\":\"2022-02-17T17:06:58+00:00\",\"dateModified\":\"2022-02-18T18:10:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/\"},\"wordCount\":784,\"publisher\":{\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01-1024x768.jpg\",\"articleSection\":[\"5. Installation\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/\",\"url\":\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/\",\"name\":\"Heatwave Cable Installation -\",\"isPartOf\":{\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01-1024x768.jpg\",\"datePublished\":\"2022-02-17T17:06:58+00:00\",\"dateModified\":\"2022-02-18T18:10:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#primaryimage\",\"url\":\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01.jpg\",\"contentUrl\":\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01.jpg\",\"width\":1500,\"height\":1125},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.heatizon.com\/heatwave\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Heatwave Cable Installation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/#website\",\"url\":\"https:\/\/www.heatizon.com\/heatwave\/\",\"name\":\"Heatwave by Heatizon\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.heatizon.com\/heatwave\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/#organization\",\"name\":\"Heatizon Systems\",\"url\":\"https:\/\/www.heatizon.com\/heatwave\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-new.png\",\"contentUrl\":\"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-new.png\",\"width\":593,\"height\":291,\"caption\":\"Heatizon Systems\"},\"image\":{\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.heatizon.com\/heatwave\/#\/schema\/person\/f57745a7ae17275e097d2c898e8ec0b3\",\"name\":\"jallen\",\"sameAs\":[\"https:\/\/www.heatizon.com\/heatwave\"],\"url\":\"https:\/\/www.heatizon.com\/heatwave\/author\/jallen\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Heatwave Cable Installation -","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/","og_locale":"en_US","og_type":"article","og_title":"Heatwave Cable Installation -","og_description":"5.3 Heatwave\u00ae Cable Installation Verify the correct Heatwave\u00ae Cable has been purchased to heat the area selected and that the correct spacing has been determined for the area being heated, the Watts to be delivered, and the size of system purchased. DO NOT CUT THE RED HEATING CABLE to fit an area. See the Tables [&hellip;]","og_url":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/","article_published_time":"2022-02-17T17:06:58+00:00","article_modified_time":"2022-02-18T18:10:37+00:00","og_image":[{"width":1500,"height":1125,"url":"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01.jpg","type":"image\/jpeg"}],"author":"jallen","twitter_card":"summary_large_image","twitter_misc":{"Written by":"jallen","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#article","isPartOf":{"@id":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/"},"author":{"name":"jallen","@id":"https:\/\/www.heatizon.com\/heatwave\/#\/schema\/person\/f57745a7ae17275e097d2c898e8ec0b3"},"headline":"Heatwave Cable Installation","datePublished":"2022-02-17T17:06:58+00:00","dateModified":"2022-02-18T18:10:37+00:00","mainEntityOfPage":{"@id":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/"},"wordCount":784,"publisher":{"@id":"https:\/\/www.heatizon.com\/heatwave\/#organization"},"image":{"@id":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01-1024x768.jpg","articleSection":["5. Installation"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/","url":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/","name":"Heatwave Cable Installation -","isPartOf":{"@id":"https:\/\/www.heatizon.com\/heatwave\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#primaryimage"},"image":{"@id":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01-1024x768.jpg","datePublished":"2022-02-17T17:06:58+00:00","dateModified":"2022-02-18T18:10:37+00:00","breadcrumb":{"@id":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#primaryimage","url":"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01.jpg","contentUrl":"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-cable01.jpg","width":1500,"height":1125},{"@type":"BreadcrumbList","@id":"https:\/\/www.heatizon.com\/heatwave\/2022\/02\/17\/heatwave-cable-installation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.heatizon.com\/heatwave\/"},{"@type":"ListItem","position":2,"name":"Heatwave Cable Installation"}]},{"@type":"WebSite","@id":"https:\/\/www.heatizon.com\/heatwave\/#website","url":"https:\/\/www.heatizon.com\/heatwave\/","name":"Heatwave by Heatizon","description":"","publisher":{"@id":"https:\/\/www.heatizon.com\/heatwave\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.heatizon.com\/heatwave\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.heatizon.com\/heatwave\/#organization","name":"Heatizon Systems","url":"https:\/\/www.heatizon.com\/heatwave\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.heatizon.com\/heatwave\/#\/schema\/logo\/image\/","url":"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-new.png","contentUrl":"https:\/\/www.heatizon.com\/heatwave\/wp-content\/uploads\/2022\/02\/heatwave-new.png","width":593,"height":291,"caption":"Heatizon Systems"},"image":{"@id":"https:\/\/www.heatizon.com\/heatwave\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.heatizon.com\/heatwave\/#\/schema\/person\/f57745a7ae17275e097d2c898e8ec0b3","name":"jallen","sameAs":["https:\/\/www.heatizon.com\/heatwave"],"url":"https:\/\/www.heatizon.com\/heatwave\/author\/jallen\/"}]}},"_links":{"self":[{"href":"https:\/\/www.heatizon.com\/heatwave\/wp-json\/wp\/v2\/posts\/310","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.heatizon.com\/heatwave\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.heatizon.com\/heatwave\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.heatizon.com\/heatwave\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.heatizon.com\/heatwave\/wp-json\/wp\/v2\/comments?post=310"}],"version-history":[{"count":2,"href":"https:\/\/www.heatizon.com\/heatwave\/wp-json\/wp\/v2\/posts\/310\/revisions"}],"predecessor-version":[{"id":416,"href":"https:\/\/www.heatizon.com\/heatwave\/wp-json\/wp\/v2\/posts\/310\/revisions\/416"}],"wp:attachment":[{"href":"https:\/\/www.heatizon.com\/heatwave\/wp-json\/wp\/v2\/media?parent=310"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.heatizon.com\/heatwave\/wp-json\/wp\/v2\/categories?post=310"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.heatizon.com\/heatwave\/wp-json\/wp\/v2\/tags?post=310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}